Analysis of the design process of Hydro-Sanitary Systems for buildings

This article presents a diagnosis of the design process of hydro-sanitary systems in real estate projects, with emphasis on the analysis of the contracts and coordination mechanisms of the projects, including the challenges of implementing the NBR 15575 standard and the BIM (Building Information Mod...

全面介绍

Saved in:
书目详细资料
Main Authors: Lima, Camila Fonseca Melo, Andery, Paulo Roberto Pereira, Veiga, Ana Cecília Rocha
格式: Online
语言:por
出版: Universidade Estadual de Campinas 2016
在线阅读:https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8645049
标签: 添加标签
没有标签, 成为第一个标记此记录!
实物特征
总结:This article presents a diagnosis of the design process of hydro-sanitary systems in real estate projects, with emphasis on the analysis of the contracts and coordination mechanisms of the projects, including the challenges of implementing the NBR 15575 standard and the BIM (Building Information Modeling). We used the case study method and conducted semi-structured interviews with different agents: designers, builders, design engineers, and architects. Additionally, other sources of evidence were analyzed, such as drawings, design documents, contracts, and coordination records. The results suggest that deficiencies in the design process of hydro-sanitary systems are primarily due to the late involvement of designers in project design and their discontinued and occasional participation, failing to include the development of the “as built” and post-occupancy evaluations. Difficulties relative to the implementation of the NBR 15575 standard and BIM can be easily foreseen, as they are unknown and are also very new in the present scenario of projects relative to hydro-sanitary systems. Concerning the management challenges encountered in this work, as well as the gaps previously highlighted in the theoretical framework and confirmed a posteriori by the investigated cases, we propose recommendations resulting in improving the management of the design process for hydro-sanitary systems. By showing the procedural deficiencies and presenting these recommendations, this study adds significant contributions besides the simple diagnosis; it further becomes a source of propositions that impact the performance of buildings and that can be extended to the best market and management practices.