BIM 4D in construction scheduling: details, benefits and difficulties
The Plan of Construction Operations (PCO) subsidizes the fulfillment of the cost, term and the expected quality of the work. These have a direct influence on the productivity obtained at the construction site, since information flaw from the generated documentation is interpreted as the main cause-a...
Uloženo v:
Hlavní autoři: | Silva, Paula Heloisa da, Crippa, Julianna, Scheer, Sergio |
---|---|
Médium: | Online |
Jazyk: | por |
Vydáno: |
Universidade Estadual de Campinas
2019
|
On-line přístup: | https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8650258 |
Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo otaguje tento záznam!
|
Podobné jednotky
-
Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs
Autor: Santos, Mírian Caroline Farias, a další
Vydáno: (2021) -
Analysis of quantities from a BIM 5D model to attend a budget process of civil construction companies
Autor: Latreille, Denise, a další
Vydáno: (2020) -
Implementation of virtual construction to improve the planning of works. Use of 4d model in urbanism located in Valencia, Venezuela
Autor: Giménez, Zulay, a další
Vydáno: (2017) -
BIM 4D aplicado à gestão logística: implementação na montagem de sistemas pré-fabricados de concreto engineer-to-order
Autor: Bataglin, Fernanda Saidelles, a další
Vydáno: (2017) -
Avaliação de estratégias para representação e análise do planejamento e controle de obras utilizando modelos BIM 4D
Autor: Brito, Douglas Malheiro de, a další
Vydáno: (2015)