BIM 4D in construction scheduling: details, benefits and difficulties
The Plan of Construction Operations (PCO) subsidizes the fulfillment of the cost, term and the expected quality of the work. These have a direct influence on the productivity obtained at the construction site, since information flaw from the generated documentation is interpreted as the main cause-a...
में बचाया:
मुख्य लेखकों: | Silva, Paula Heloisa da, Crippa, Julianna, Scheer, Sergio |
---|---|
स्वरूप: | Online |
भाषा: | por |
प्रकाशित: |
Universidade Estadual de Campinas
2019
|
ऑनलाइन पहुंच: | https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8650258 |
टैग : |
टैग जोड़ें
कोई टैग नहीं, इस रिकॉर्ड को टैग करने वाले पहले व्यक्ति बनें!
|
समान संसाधन
-
Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs
द्वारा: Santos, Mírian Caroline Farias, और अन्य
प्रकाशित: (2021) -
Analysis of quantities from a BIM 5D model to attend a budget process of civil construction companies
द्वारा: Latreille, Denise, और अन्य
प्रकाशित: (2020) -
Implementation of virtual construction to improve the planning of works. Use of 4d model in urbanism located in Valencia, Venezuela
द्वारा: Giménez, Zulay, और अन्य
प्रकाशित: (2017) -
BIM 4D aplicado à gestão logística: implementação na montagem de sistemas pré-fabricados de concreto engineer-to-order
द्वारा: Bataglin, Fernanda Saidelles, और अन्य
प्रकाशित: (2017) -
Avaliação de estratégias para representação e análise do planejamento e controle de obras utilizando modelos BIM 4D
द्वारा: Brito, Douglas Malheiro de, और अन्य
प्रकाशित: (2015)