BIM 4D in construction scheduling: details, benefits and difficulties
The Plan of Construction Operations (PCO) subsidizes the fulfillment of the cost, term and the expected quality of the work. These have a direct influence on the productivity obtained at the construction site, since information flaw from the generated documentation is interpreted as the main cause-a...
保存先:
主要な著者: | Silva, Paula Heloisa da, Crippa, Julianna, Scheer, Sergio |
---|---|
フォーマット: | Online |
言語: | por |
出版事項: |
Universidade Estadual de Campinas
2019
|
オンライン・アクセス: | https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8650258 |
タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|
類似資料
-
Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs
著者:: Santos, Mírian Caroline Farias, 等
出版事項: (2021) -
Analysis of quantities from a BIM 5D model to attend a budget process of civil construction companies
著者:: Latreille, Denise, 等
出版事項: (2020) -
Implementation of virtual construction to improve the planning of works. Use of 4d model in urbanism located in Valencia, Venezuela
著者:: Giménez, Zulay, 等
出版事項: (2017) -
BIM 4D aplicado à gestão logística: implementação na montagem de sistemas pré-fabricados de concreto engineer-to-order
著者:: Bataglin, Fernanda Saidelles, 等
出版事項: (2017) -
Avaliação de estratégias para representação e análise do planejamento e controle de obras utilizando modelos BIM 4D
著者:: Brito, Douglas Malheiro de, 等
出版事項: (2015)