BIM 4D in construction scheduling: details, benefits and difficulties

The Plan of Construction Operations (PCO) subsidizes the fulfillment of the cost, term and the expected quality of the work. These have a direct influence on the productivity obtained at the construction site, since information flaw from the generated documentation is interpreted as the main cause-a...

Celý popis

Uloženo v:
Podrobná bibliografie
Hlavní autoři: Silva, Paula Heloisa da, Crippa, Julianna, Scheer, Sergio
Médium: Online
Jazyk:por
Vydáno: Universidade Estadual de Campinas 2019
On-line přístup:https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8650258
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo otaguje tento záznam!