Integrated BIM model managing the flow of information in the design process
The design development stage is one of the most important stages for the quality of the project, as all parameters of a proposal are defined. Furthermore, the creation, coordination, and visualization of the project has undergone changes since the adoption of BIM. Thus, it is necessary to have infor...
保存先:
| 主要な著者: | Barros, Roberta Augusta Menezes Lopes de, Librelotto, Lisiane Ilha, Medina, Franchesca |
|---|---|
| フォーマット: | Online |
| 言語: | por |
| 出版事項: |
Universidade Estadual de Campinas
2020
|
| オンライン・アクセス: | https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8653830 |
| タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|
類似資料
-
Estratégias para ensino de orçamentação com adoção de BIM em ambiente acadêmico
著者:: Mattana, Leticia, 等
出版事項: (2018) -
Integrating acoustic simulator in BIM modeling tool
著者:: Menegotto, José Luis, 等
出版事項: (2019) -
Analysis of maturity models for Building Information Modeling (BIM) implementation measurement
著者:: Lima, Luciana de Oliveira, 等
出版事項: (2021) -
Proposed Model for Integrating RAMS Method in the Design Process in Construction
著者:: Al-Jibouri, Saad, 等
出版事項: (2010) -
Building information modelling (BIM) in Life Cycle Assesment: literature review and comparative study
著者:: Barros, Natalia Nakamura, 等
出版事項: (2016)