Proposed Model for Integrating RAMS Method in the Design Process in Construction

There is a growing trend in the Netherlands for outsourcing public construction activities to the private sector through the use of integrated contracts. There is also an increasing emphasis from public clients on the use of RAMS and life cycle costing (LCC) in the design process of infrastructural...

Szczegółowa specyfikacja

Zapisane w:
Opis bibliograficzny
Główni autorzy: Al-Jibouri, Saad, Ogink, Guus
Format: Online
Wydane: Universidade de São Paulo. Instituto de Arquitetura e Urbanismo 2010
Dostęp online:https://www.revistas.usp.br/gestaodeprojetos/article/view/50978
Etykiety: Dodaj etykietę
Nie ma etykietki, Dołącz pierwszą etykiete!