Study on the factors of delay in construction works

The delay in civil construction works is observed globally and affects the economy of countries. Therefore, identifying the causes of delays is of paramount importance to minimize their consequences. This paper aims at identifying the causes of delay in construction works and their analysis and exis...

全面介绍

Saved in:
书目详细资料
Main Authors: Carvalho, André Brasil, Maués, Luiz Maurício Furtado, Moreira, Felipe de Sá, Reis, Caio José Losada
格式: Online
语言:eng
出版: ANTAC - Associação Nacional de Tecnologia do Ambiente Construído 2021
在线阅读:https://seer.ufrgs.br/ambienteconstruido/article/view/102754
标签: 添加标签
没有标签, 成为第一个标记此记录!
实物特征
总结:The delay in civil construction works is observed globally and affects the economy of countries. Therefore, identifying the causes of delays is of paramount importance to minimize their consequences. This paper aims at identifying the causes of delay in construction works and their analysis and existing correlations through statistical factor analysis. The research methodology included a Systematic Literature Review (SLR), a Survey Research through questionnaires and interviews was conducted, as well as the identification of the main causes of delay through the Relative Importance Index (RIL) and the ABC Curve. Finally, factor analysis of the causes of delay was performed, not limiting only to their identification. The results showed that the 12 identified causes are correlated to 4 delay factors, which account for 69.18% of the sample variance: supply management (21.41%); workforce management (20,79%); project management (17.64%) and management of climatic conditions (9.34%). It is concluded hereby that the delay factors mentioned herein can be considered management deficiencies in the projects and that the research has expanded the knowledge on construction delays, thus contributing to the frontier of knowledge to mitigate this problem in several countries, especially developing ones.