Study on the factors of delay in construction works
The delay in civil construction works is observed globally and affects the economy of countries. Therefore, identifying the causes of delays is of paramount importance to minimize their consequences. This paper aims at identifying the causes of delay in construction works and their analysis and exis...
Wedi'i Gadw mewn:
| Prif Awduron: | , , , |
|---|---|
| Fformat: | Online |
| Iaith: | eng |
| Cyhoeddwyd: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2021
|
| Mynediad Ar-lein: | https://seer.ufrgs.br/ambienteconstruido/article/view/102754 |
| Tagiau: |
Ychwanegu Tag
Dim Tagiau, Byddwch y cyntaf i dagio'r cofnod hwn!
|
| id |
ojs-article-102754 |
|---|---|
| record_format |
ojs |
| spelling |
ojs-article-1027542021-05-24T16:39:03Z Study on the factors of delay in construction works Carvalho, André Brasil Maués, Luiz Maurício Furtado Moreira, Felipe de Sá Reis, Caio José Losada Factors of Construction Work Delay. Factor Analysis. Causes of Delay. Project Management. The delay in civil construction works is observed globally and affects the economy of countries. Therefore, identifying the causes of delays is of paramount importance to minimize their consequences. This paper aims at identifying the causes of delay in construction works and their analysis and existing correlations through statistical factor analysis. The research methodology included a Systematic Literature Review (SLR), a Survey Research through questionnaires and interviews was conducted, as well as the identification of the main causes of delay through the Relative Importance Index (RIL) and the ABC Curve. Finally, factor analysis of the causes of delay was performed, not limiting only to their identification. The results showed that the 12 identified causes are correlated to 4 delay factors, which account for 69.18% of the sample variance: supply management (21.41%); workforce management (20,79%); project management (17.64%) and management of climatic conditions (9.34%). It is concluded hereby that the delay factors mentioned herein can be considered management deficiencies in the projects and that the research has expanded the knowledge on construction delays, thus contributing to the frontier of knowledge to mitigate this problem in several countries, especially developing ones. ANTAC - Associação Nacional de Tecnologia do Ambiente Construído Coordenação de Aperfeiçoamento de Pessoal de Nível Superios - Brasil (CAPES) 2021-05-24 info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion https://seer.ufrgs.br/ambienteconstruido/article/view/102754 Ambiente Construído; v. 21, n. 3 (2021); 27-46 Ambiente Construído; v. 21, n. 3 (2021); 27-46 Ambiente Construído; v. 21, n. 3 (2021); 27-46 1678-8621 1415-8876 eng https://seer.ufrgs.br/ambienteconstruido/article/view/102754/61738 Direitos autorais 2021 Ambiente Construído https://creativecommons.org/licenses/by/4.0 |
| institution |
Universidade Federal do Rio Grande do Sul |
| collection |
OJS |
| language |
eng |
| format |
Online |
| author |
Carvalho, André Brasil Maués, Luiz Maurício Furtado Moreira, Felipe de Sá Reis, Caio José Losada |
| spellingShingle |
Carvalho, André Brasil Maués, Luiz Maurício Furtado Moreira, Felipe de Sá Reis, Caio José Losada Study on the factors of delay in construction works |
| author_facet |
Carvalho, André Brasil Maués, Luiz Maurício Furtado Moreira, Felipe de Sá Reis, Caio José Losada |
| author_sort |
Carvalho, André Brasil |
| title |
Study on the factors of delay in construction works |
| title_short |
Study on the factors of delay in construction works |
| title_full |
Study on the factors of delay in construction works |
| title_fullStr |
Study on the factors of delay in construction works |
| title_full_unstemmed |
Study on the factors of delay in construction works |
| title_sort |
study on the factors of delay in construction works |
| description |
The delay in civil construction works is observed globally and affects the economy of countries. Therefore, identifying the causes of delays is of paramount importance to minimize their consequences. This paper aims at identifying the causes of delay in construction works and their analysis and existing correlations through statistical factor analysis. The research methodology included a Systematic Literature Review (SLR), a Survey Research through questionnaires and interviews was conducted, as well as the identification of the main causes of delay through the Relative Importance Index (RIL) and the ABC Curve. Finally, factor analysis of the causes of delay was performed, not limiting only to their identification. The results showed that the 12 identified causes are correlated to 4 delay factors, which account for 69.18% of the sample variance: supply management (21.41%); workforce management (20,79%); project management (17.64%) and management of climatic conditions (9.34%). It is concluded hereby that the delay factors mentioned herein can be considered management deficiencies in the projects and that the research has expanded the knowledge on construction delays, thus contributing to the frontier of knowledge to mitigate this problem in several countries, especially developing ones. |
| publisher |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído |
| publishDate |
2021 |
| url |
https://seer.ufrgs.br/ambienteconstruido/article/view/102754 |
| work_keys_str_mv |
AT carvalhoandrebrasil studyonthefactorsofdelayinconstructionworks AT mauesluizmauriciofurtado studyonthefactorsofdelayinconstructionworks AT moreirafelipedesa studyonthefactorsofdelayinconstructionworks AT reiscaiojoselosada studyonthefactorsofdelayinconstructionworks |
| _version_ |
1709370585900908544 |