Study on the factors of delay in construction works
The delay in civil construction works is observed globally and affects the economy of countries. Therefore, identifying the causes of delays is of paramount importance to minimize their consequences. This paper aims at identifying the causes of delay in construction works and their analysis and exis...
Bewaard in:
| Hoofdauteurs: | Carvalho, André Brasil, Maués, Luiz Maurício Furtado, Moreira, Felipe de Sá, Reis, Caio José Losada |
|---|---|
| Formaat: | Online |
| Taal: | eng |
| Gepubliceerd in: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2021
|
| Online toegang: | https://seer.ufrgs.br/ambienteconstruido/article/view/102754 |
| Tags: |
Voeg label toe
Geen labels, Wees de eerste die dit record labelt!
|
Gelijkaardige items
-
Construction delays: a case study in the Brazilian Amazon
door: Maués, Luiz Mauricio Furtado, et al.
Gepubliceerd in: (2017) -
Causes of delay in the construction of drinking water and sewer projects in Ecuador
door: Castro Carrera, Fernando Francisco, et al.
Gepubliceerd in: (2022) -
Construction duration predictive model based on factorial analysis and fuzzy logic
door: Maués, Luiz Maurício Furtado, et al.
Gepubliceerd in: (2019) -
Theory of production in construction industry: an analysis of the literature
door: Vivan, André Luiz, et al.
Gepubliceerd in: (2021) -
The sewerage works and the construction of the first avenues in Lourenço Marques, Mozambique
door: Franco de Mendonça, Lisandra
Gepubliceerd in: (2018)