Construction delays: a case study in the Brazilian Amazon
The construction industry is one of the industrial sectors with the lowest rates of fulfilment of contract deadlines, especially in developing countries. This fact has been the focus of considerable discussions seeking to identify the causes of the delays. The main purpose of this paper is to use fa...
Αποθηκεύτηκε σε:
| Κύριοι συγγραφείς: | Maués, Luiz Mauricio Furtado, Santana, Wylliam Bessa, Santos, Paulo Cerqueira dos, Neves, Renato Martins das, Duarte, André Augusto Azevedo Montenegro |
|---|---|
| Μορφή: | Online |
| Γλώσσα: | eng |
| Έκδοση: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2017
|
| Διαθέσιμο Online: | https://seer.ufrgs.br/ambienteconstruido/article/view/68854 |
| Ετικέτες: |
Προσθήκη ετικέτας
Δεν υπάρχουν, Καταχωρήστε ετικέτα πρώτοι!
|
Παρόμοια τεκμήρια
-
Study on the factors of delay in construction works
ανά: Carvalho, André Brasil, κ.ά.
Έκδοση: (2021) -
Alterações de custo e prazo em obras públicas
ανά: Alvarenga, Felipe Campos, κ.ά.
Έκδοση: (2020) -
Causes of delay in the construction of drinking water and sewer projects in Ecuador
ανά: Castro Carrera, Fernando Francisco, κ.ά.
Έκδοση: (2022) -
Construction duration predictive model based on factorial analysis and fuzzy logic
ανά: Maués, Luiz Maurício Furtado, κ.ά.
Έκδοση: (2019) -
Influences of global tourism on the Amazon
ανά: Ochoa Zuluaga, Germán Ignacio
Έκδοση: (2019)