Construction delays: a case study in the Brazilian Amazon
The construction industry is one of the industrial sectors with the lowest rates of fulfilment of contract deadlines, especially in developing countries. This fact has been the focus of considerable discussions seeking to identify the causes of the delays. The main purpose of this paper is to use fa...
Saved in:
| Main Authors: | Maués, Luiz Mauricio Furtado, Santana, Wylliam Bessa, Santos, Paulo Cerqueira dos, Neves, Renato Martins das, Duarte, André Augusto Azevedo Montenegro |
|---|---|
| Formáid: | Online |
| Teanga: | eng |
| Foilsithe: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2017
|
| Rochtain Ar Líne: | https://seer.ufrgs.br/ambienteconstruido/article/view/68854 |
| Clibeanna: |
Cuir Clib Leis
Gan Chlibeanna, Bí ar an gcéad duine leis an taifead seo a chlibeáil!
|
Míreanna Comhchosúla
-
Study on the factors of delay in construction works
le: Carvalho, André Brasil, et al.
Foilsithe: (2021) -
Alterações de custo e prazo em obras públicas
le: Alvarenga, Felipe Campos, et al.
Foilsithe: (2020) -
Causes of delay in the construction of drinking water and sewer projects in Ecuador
le: Castro Carrera, Fernando Francisco, et al.
Foilsithe: (2022) -
Construction duration predictive model based on factorial analysis and fuzzy logic
le: Maués, Luiz Maurício Furtado, et al.
Foilsithe: (2019) -
Influences of global tourism on the Amazon
le: Ochoa Zuluaga, Germán Ignacio
Foilsithe: (2019)