A quantitative analysis of production planning and control metrics: impacts of the Last Planner System and factors that affect its effectiveness

 Much effort has been made for improving the performance of the production planning and control process in the construction industry through the implementation of the Last Planner System of Production Control (LPS). Despite the wide dissemination of Last Planner in different countries, very few quan...

Full description

Saved in:
Bibliographic Details
Main Authors: Moura, Camile Borges, Formoso, Carlos Torres
Format: Online
Language:por
Published: ANTAC - Associação Nacional de Tecnologia do Ambiente Construído 2009
Online Access:https://seer.ufrgs.br/ambienteconstruido/article/view/7695
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary: Much effort has been made for improving the performance of the production planning and control process in the construction industry through the implementation of the Last Planner System of Production Control (LPS). Despite the wide dissemination of Last Planner in different countries, very few quantitative analyses have been undertaken on the impact of its implementation and on the factors that affect its effectiveness. Using an existing database, this study aims to assess the impact of the effectiveness of Last Planner based production planning and control systems on the performance of construction projects in terms of cost and time. This investigation has also analyzed the impact of a set of site management practices on the effectiveness of those planning systems. Several analyses were carried out using regression analysis techniques. In spite of some limitations on the data available, the study discusses the influence of Last Planner on project performance, and of the importance of site management best practices on the effectiveness of planning and control.