A quantitative analysis of production planning and control metrics: impacts of the Last Planner System and factors that affect its effectiveness

 Much effort has been made for improving the performance of the production planning and control process in the construction industry through the implementation of the Last Planner System of Production Control (LPS). Despite the wide dissemination of Last Planner in different countries, very few quan...

ver descrição completa

Na minha lista:
Detalhes bibliográficos
Principais autores: Moura, Camile Borges, Formoso, Carlos Torres
Formato: Online
Idioma:por
Publicado em: ANTAC - Associação Nacional de Tecnologia do Ambiente Construído 2009
Acesso em linha:https://seer.ufrgs.br/ambienteconstruido/article/view/7695
Tags: Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
id ojs-article-7695
record_format ojs
spelling ojs-article-76952010-02-03T16:40:25Z A quantitative analysis of production planning and control metrics: impacts of the Last Planner System and factors that affect its effectiveness Análise quantitativa de indicadores de planejamento e controle da produção: impactos do Sistema Last Planner e fatores que afetam a sua eficácia Moura, Camile Borges Formoso, Carlos Torres Planejamento e Controle da Produção. Last Planner. Medição de Desempenho.  Much effort has been made for improving the performance of the production planning and control process in the construction industry through the implementation of the Last Planner System of Production Control (LPS). Despite the wide dissemination of Last Planner in different countries, very few quantitative analyses have been undertaken on the impact of its implementation and on the factors that affect its effectiveness. Using an existing database, this study aims to assess the impact of the effectiveness of Last Planner based production planning and control systems on the performance of construction projects in terms of cost and time. This investigation has also analyzed the impact of a set of site management practices on the effectiveness of those planning systems. Several analyses were carried out using regression analysis techniques. In spite of some limitations on the data available, the study discusses the influence of Last Planner on project performance, and of the importance of site management best practices on the effectiveness of planning and control. O processo de planejamento e controle da produção tem grande impacto no desempenho dos empreendimentos de construção. Diversos esforços têm sido realizados na indústria da construção para melhorar o desempenho deste processo através da implementação do Sistema Last Planner de Controle da Produção. Em que pese a ampla disseminação deste sistema em diversos países, foram realizados poucos estudos quantitativos sobre o impacto da sua implementação e os fatores que afetam a eficácia do planejamento e controle. Utilizando uma base de dados de empreendimentos existente, o presente trabalho buscou avaliar o impacto da eficácia de sistemas de planejamento e controle da produção, baseados no Last Planner, no desempenho de empreendimentos da construção civil quanto ao custo e ao prazo. Foi também analisada a influência de boas práticas de canteiros de obras na eficácia destes sistemas. Através da técnica de regressão múltipla foram realizadas diversas análises envolvendo indicadores de eficácia do planejamento, desvio de custo, desvio de prazo e boas práticas de canteiros de obras. Apesar de algumas limitações nos dados disponíveis, apontou-se algumas evidências sobre o impacto do Last Planner no desempenho dos empreendimentos e a importância das boas práticas de canteiros de obras na eficácia do planejamento. ANTAC - Associação Nacional de Tecnologia do Ambiente Construído CNPq 2009-10-06 info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion application/pdf https://seer.ufrgs.br/ambienteconstruido/article/view/7695 Ambiente Construído; v. 9, n. 3 (2009); 57-74 Ambiente Construído; v. 9, n. 3 (2009); 57-74 Ambiente Construído; v. 9, n. 3 (2009); 57-74 1678-8621 1415-8876 por https://seer.ufrgs.br/ambienteconstruido/article/view/7695/6624 Direitos autorais 2016 Ambiente Construído https://creativecommons.org/licenses/by/4.0
institution Universidade Federal do Rio Grande do Sul
collection OJS
language por
format Online
author Moura, Camile Borges
Formoso, Carlos Torres
spellingShingle Moura, Camile Borges
Formoso, Carlos Torres
A quantitative analysis of production planning and control metrics: impacts of the Last Planner System and factors that affect its effectiveness
author_facet Moura, Camile Borges
Formoso, Carlos Torres
author_sort Moura, Camile Borges
title A quantitative analysis of production planning and control metrics: impacts of the Last Planner System and factors that affect its effectiveness
title_short A quantitative analysis of production planning and control metrics: impacts of the Last Planner System and factors that affect its effectiveness
title_full A quantitative analysis of production planning and control metrics: impacts of the Last Planner System and factors that affect its effectiveness
title_fullStr A quantitative analysis of production planning and control metrics: impacts of the Last Planner System and factors that affect its effectiveness
title_full_unstemmed A quantitative analysis of production planning and control metrics: impacts of the Last Planner System and factors that affect its effectiveness
title_sort quantitative analysis of production planning and control metrics: impacts of the last planner system and factors that affect its effectiveness
description  Much effort has been made for improving the performance of the production planning and control process in the construction industry through the implementation of the Last Planner System of Production Control (LPS). Despite the wide dissemination of Last Planner in different countries, very few quantitative analyses have been undertaken on the impact of its implementation and on the factors that affect its effectiveness. Using an existing database, this study aims to assess the impact of the effectiveness of Last Planner based production planning and control systems on the performance of construction projects in terms of cost and time. This investigation has also analyzed the impact of a set of site management practices on the effectiveness of those planning systems. Several analyses were carried out using regression analysis techniques. In spite of some limitations on the data available, the study discusses the influence of Last Planner on project performance, and of the importance of site management best practices on the effectiveness of planning and control.
publisher ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
publishDate 2009
url https://seer.ufrgs.br/ambienteconstruido/article/view/7695
work_keys_str_mv AT mouracamileborges aquantitativeanalysisofproductionplanningandcontrolmetricsimpactsofthelastplannersystemandfactorsthataffectitseffectiveness
AT formosocarlostorres aquantitativeanalysisofproductionplanningandcontrolmetricsimpactsofthelastplannersystemandfactorsthataffectitseffectiveness
AT mouracamileborges analisequantitativadeindicadoresdeplanejamentoecontroledaproducaoimpactosdosistemalastplannerefatoresqueafetamasuaeficacia
AT formosocarlostorres analisequantitativadeindicadoresdeplanejamentoecontroledaproducaoimpactosdosistemalastplannerefatoresqueafetamasuaeficacia
AT mouracamileborges quantitativeanalysisofproductionplanningandcontrolmetricsimpactsofthelastplannersystemandfactorsthataffectitseffectiveness
AT formosocarlostorres quantitativeanalysisofproductionplanningandcontrolmetricsimpactsofthelastplannersystemandfactorsthataffectitseffectiveness
_version_ 1709370646101753856