A quantitative analysis of production planning and control metrics: impacts of the Last Planner System and factors that affect its effectiveness
Much effort has been made for improving the performance of the production planning and control process in the construction industry through the implementation of the Last Planner System of Production Control (LPS). Despite the wide dissemination of Last Planner in different countries, very few quan...
Saved in:
Main Authors: | Moura, Camile Borges, Formoso, Carlos Torres |
---|---|
Format: | Online |
Sprog: | por |
Udgivet: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2009
|
Online adgang: | https://seer.ufrgs.br/ambienteconstruido/article/view/7695 |
Tags: |
Tilføj Tag
Ingen Tags, Vær først til at tagge denne postø!
|
Lignende værker
-
Uma proposta de integração do modelo BIM ao sistema last planner
af: Rodrigues, Priscilla Borges de Freitas, et al.
Udgivet: (2018) -
SOCIO-SPATIAL CONTROL PRACTICES AND ITS EFFECTS ON THE TERRITORY
af: Quintero Pérez, Gloria Isabel
Udgivet: (2008) -
Planejamento tradicional, Location-Based Management System e Last Planner System: um modelo integrado
af: Olivieri, Hylton, et al.
Udgivet: (2015) -
Sky view factor and the heat island effect in Valparaiso
af: Carrasco, Claudio, et al.
Udgivet: (2016) -
Light and its effects. Experiences
af: Quintero López, Enrique
Udgivet: (2016)