A quantitative analysis of production planning and control metrics: impacts of the Last Planner System and factors that affect its effectiveness
Much effort has been made for improving the performance of the production planning and control process in the construction industry through the implementation of the Last Planner System of Production Control (LPS). Despite the wide dissemination of Last Planner in different countries, very few quan...
Gespeichert in:
Hauptverfasser: | Moura, Camile Borges, Formoso, Carlos Torres |
---|---|
Format: | Online |
Sprache: | por |
Veröffentlicht: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2009
|
Online Zugang: | https://seer.ufrgs.br/ambienteconstruido/article/view/7695 |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Ähnliche Einträge
-
Uma proposta de integração do modelo BIM ao sistema last planner
von: Rodrigues, Priscilla Borges de Freitas, et al.
Veröffentlicht: (2018) -
SOCIO-SPATIAL CONTROL PRACTICES AND ITS EFFECTS ON THE TERRITORY
von: Quintero Pérez, Gloria Isabel
Veröffentlicht: (2008) -
Planejamento tradicional, Location-Based Management System e Last Planner System: um modelo integrado
von: Olivieri, Hylton, et al.
Veröffentlicht: (2015) -
Sky view factor and the heat island effect in Valparaiso
von: Carrasco, Claudio, et al.
Veröffentlicht: (2016) -
Light and its effects. Experiences
von: Quintero López, Enrique
Veröffentlicht: (2016)