A quantitative analysis of production planning and control metrics: impacts of the Last Planner System and factors that affect its effectiveness
Much effort has been made for improving the performance of the production planning and control process in the construction industry through the implementation of the Last Planner System of Production Control (LPS). Despite the wide dissemination of Last Planner in different countries, very few quan...
שמור ב:
Main Authors: | Moura, Camile Borges, Formoso, Carlos Torres |
---|---|
פורמט: | Online |
שפה: | por |
יצא לאור: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2009
|
גישה מקוונת: | https://seer.ufrgs.br/ambienteconstruido/article/view/7695 |
תגים: |
הוספת תג
אין תגיות, היה/י הראשונ/ה לתייג את הרשומה!
|
פריטים דומים
-
Uma proposta de integração do modelo BIM ao sistema last planner
מאת: Rodrigues, Priscilla Borges de Freitas, et al.
יצא לאור: (2018) -
SOCIO-SPATIAL CONTROL PRACTICES AND ITS EFFECTS ON THE TERRITORY
מאת: Quintero Pérez, Gloria Isabel
יצא לאור: (2008) -
Planejamento tradicional, Location-Based Management System e Last Planner System: um modelo integrado
מאת: Olivieri, Hylton, et al.
יצא לאור: (2015) -
Sky view factor and the heat island effect in Valparaiso
מאת: Carrasco, Claudio, et al.
יצא לאור: (2016) -
Light and its effects. Experiences
מאת: Quintero López, Enrique
יצא לאור: (2016)