A quantitative analysis of production planning and control metrics: impacts of the Last Planner System and factors that affect its effectiveness
Much effort has been made for improving the performance of the production planning and control process in the construction industry through the implementation of the Last Planner System of Production Control (LPS). Despite the wide dissemination of Last Planner in different countries, very few quan...
में बचाया:
मुख्य लेखकों: | Moura, Camile Borges, Formoso, Carlos Torres |
---|---|
स्वरूप: | Online |
भाषा: | por |
प्रकाशित: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2009
|
ऑनलाइन पहुंच: | https://seer.ufrgs.br/ambienteconstruido/article/view/7695 |
टैग : |
टैग जोड़ें
कोई टैग नहीं, इस रिकॉर्ड को टैग करने वाले पहले व्यक्ति बनें!
|
समान संसाधन
-
Uma proposta de integração do modelo BIM ao sistema last planner
द्वारा: Rodrigues, Priscilla Borges de Freitas, और अन्य
प्रकाशित: (2018) -
SOCIO-SPATIAL CONTROL PRACTICES AND ITS EFFECTS ON THE TERRITORY
द्वारा: Quintero Pérez, Gloria Isabel
प्रकाशित: (2008) -
Planejamento tradicional, Location-Based Management System e Last Planner System: um modelo integrado
द्वारा: Olivieri, Hylton, और अन्य
प्रकाशित: (2015) -
Sky view factor and the heat island effect in Valparaiso
द्वारा: Carrasco, Claudio, और अन्य
प्रकाशित: (2016) -
Light and its effects. Experiences
द्वारा: Quintero López, Enrique
प्रकाशित: (2016)