A quantitative analysis of production planning and control metrics: impacts of the Last Planner System and factors that affect its effectiveness
Much effort has been made for improving the performance of the production planning and control process in the construction industry through the implementation of the Last Planner System of Production Control (LPS). Despite the wide dissemination of Last Planner in different countries, very few quan...
Shranjeno v:
Main Authors: | Moura, Camile Borges, Formoso, Carlos Torres |
---|---|
Format: | Online |
Jezik: | por |
Izdano: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2009
|
Online dostop: | https://seer.ufrgs.br/ambienteconstruido/article/view/7695 |
Oznake: |
Označite
Brez oznak, prvi označite!
|
Podobne knjige/članki
-
Uma proposta de integração do modelo BIM ao sistema last planner
od: Rodrigues, Priscilla Borges de Freitas, et al.
Izdano: (2018) -
SOCIO-SPATIAL CONTROL PRACTICES AND ITS EFFECTS ON THE TERRITORY
od: Quintero Pérez, Gloria Isabel
Izdano: (2008) -
Planejamento tradicional, Location-Based Management System e Last Planner System: um modelo integrado
od: Olivieri, Hylton, et al.
Izdano: (2015) -
Sky view factor and the heat island effect in Valparaiso
od: Carrasco, Claudio, et al.
Izdano: (2016) -
Light and its effects. Experiences
od: Quintero López, Enrique
Izdano: (2016)