A quantitative analysis of production planning and control metrics: impacts of the Last Planner System and factors that affect its effectiveness
Much effort has been made for improving the performance of the production planning and control process in the construction industry through the implementation of the Last Planner System of Production Control (LPS). Despite the wide dissemination of Last Planner in different countries, very few quan...
Kaydedildi:
Asıl Yazarlar: | Moura, Camile Borges, Formoso, Carlos Torres |
---|---|
Materyal Türü: | Online |
Dil: | por |
Baskı/Yayın Bilgisi: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2009
|
Online Erişim: | https://seer.ufrgs.br/ambienteconstruido/article/view/7695 |
Etiketler: |
Etiketle
Etiket eklenmemiş, İlk siz ekleyin!
|
Benzer Materyaller
-
Uma proposta de integração do modelo BIM ao sistema last planner
Yazar:: Rodrigues, Priscilla Borges de Freitas, ve diğerleri
Baskı/Yayın Bilgisi: (2018) -
SOCIO-SPATIAL CONTROL PRACTICES AND ITS EFFECTS ON THE TERRITORY
Yazar:: Quintero Pérez, Gloria Isabel
Baskı/Yayın Bilgisi: (2008) -
Planejamento tradicional, Location-Based Management System e Last Planner System: um modelo integrado
Yazar:: Olivieri, Hylton, ve diğerleri
Baskı/Yayın Bilgisi: (2015) -
Sky view factor and the heat island effect in Valparaiso
Yazar:: Carrasco, Claudio, ve diğerleri
Baskı/Yayın Bilgisi: (2016) -
Light and its effects. Experiences
Yazar:: Quintero López, Enrique
Baskı/Yayın Bilgisi: (2016)