Influence of electric arc furnace dust and lime kiln waste in Portland cement hydration

Studies have indicated that the use of electric arc furnace dust (EAFD) results in a delay in the hydration time of Portland cement. Calcium-rich waste such as lime kiln waste (LKW) is one of the techniques used to offset this delay as it accounts for the lack of this element in calcium silicate hyd...

Cur síos iomlán

Saved in:
Sonraí Bibleagrafaíochta
Main Authors: Metz, Josué Claudio, Maciel, Elenize Ferreira, Garbin, Marilise, Modolo, Regina Célia Espinosa, Moraes, Carlos Alberto Mendes, Gomes, Lucas Bonn, Brehm, Feliciane Andrade
Formáid: Online
Teanga:eng
Foilsithe: ANTAC - Associação Nacional de Tecnologia do Ambiente Construído 2020
Rochtain Ar Líne:https://seer.ufrgs.br/ambienteconstruido/article/view/99831
Clibeanna: Cuir Clib Leis
Gan Chlibeanna, Bí ar an gcéad duine leis an taifead seo a chlibeáil!