Influence of electric arc furnace dust and lime kiln waste in Portland cement hydration

Studies have indicated that the use of electric arc furnace dust (EAFD) results in a delay in the hydration time of Portland cement. Calcium-rich waste such as lime kiln waste (LKW) is one of the techniques used to offset this delay as it accounts for the lack of this element in calcium silicate hyd...

Popoln opis

Shranjeno v:
Bibliografske podrobnosti
Main Authors: Metz, Josué Claudio, Maciel, Elenize Ferreira, Garbin, Marilise, Modolo, Regina Célia Espinosa, Moraes, Carlos Alberto Mendes, Gomes, Lucas Bonn, Brehm, Feliciane Andrade
Format: Online
Jezik:eng
Izdano: ANTAC - Associação Nacional de Tecnologia do Ambiente Construído 2020
Online dostop:https://seer.ufrgs.br/ambienteconstruido/article/view/99831
Oznake: Označite
Brez oznak, prvi označite!