Information requirements and process maps for the reinforced concrete structures design: a case study using the idm methodology

The construction industry is facing the Building Information Modeling (BIM) paradigm and all its potential. In order to this paradigm becomes largely adopted and fully utilized, the interoperability issue must be properly addressed. While the IFC schema covers the data model necessary for data excha...

Deskribapen osoa

Gorde:
Xehetasun bibliografikoak
Egile Nagusiak: Antunes, Cristiano Eduardo, Scheer, Sérgio
Formatua: Online
Hizkuntza:por
Argitaratua: Universidade Estadual de Campinas 2014
Sarrera elektronikoa:https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634541
Etiketak: Etiketa erantsi
Etiketarik gabe, Izan zaitez lehena erregistro honi etiketa jartzen!
id oai:ojs.periodicos.sbu.unicamp.br:article-8634541
record_format ojs
institution Universidade Estadual de Campinas
collection OJS
language por
format Online
author Antunes, Cristiano Eduardo
Scheer, Sérgio
spellingShingle Antunes, Cristiano Eduardo
Scheer, Sérgio
Information requirements and process maps for the reinforced concrete structures design: a case study using the idm methodology
author_facet Antunes, Cristiano Eduardo
Scheer, Sérgio
author_sort Antunes, Cristiano Eduardo
title Information requirements and process maps for the reinforced concrete structures design: a case study using the idm methodology
title_short Information requirements and process maps for the reinforced concrete structures design: a case study using the idm methodology
title_full Information requirements and process maps for the reinforced concrete structures design: a case study using the idm methodology
title_fullStr Information requirements and process maps for the reinforced concrete structures design: a case study using the idm methodology
title_full_unstemmed Information requirements and process maps for the reinforced concrete structures design: a case study using the idm methodology
title_sort information requirements and process maps for the reinforced concrete structures design: a case study using the idm methodology
description The construction industry is facing the Building Information Modeling (BIM) paradigm and all its potential. In order to this paradigm becomes largely adopted and fully utilized, the interoperability issue must be properly addressed. While the IFC schema covers the data model necessary for data exchange, the processes occurring daily in the industry need to be better known. In this sense, this paper reports a research that explored the design process of reinforced concrete structures using BIM-based systems. To reach this goal, a case study was developed in a structural design company, where the researcher collected data by participant observation, interviews, and documental analysis. After the data collection and the analysis of the internal design routines and external communications during the design process, process maps were elaborated containing all the activities developed during the contracted projects. Furthermore, it was appropriately registered the information requirements for each one of the activities using the IDM (Information Delivery Manual) standards. It was possible to characterize the design process of reinforced concrete structures in the studied company when using BIM-based systems, as well as to identify the stakeholder information requirements. After the processes and information flow analysis it was also possible to propose a new optimized workflow. This workflow aimed to reduce the number of analogic activities during the studied design process, as well as helped to propose new information exchanges following the IDM methodology.
publisher Universidade Estadual de Campinas
publishDate 2014
url https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634541
work_keys_str_mv AT antunescristianoeduardo informationrequirementsandprocessmapsforthereinforcedconcretestructuresdesignacasestudyusingtheidmmethodology
AT scheersergio informationrequirementsandprocessmapsforthereinforcedconcretestructuresdesignacasestudyusingtheidmmethodology
AT antunescristianoeduardo requisitosdeinformacaoemapasdoprocessodeprojetodeestruturasemconcretoarmadoumestudodecasoutilizandoametodologiaidm
AT scheersergio requisitosdeinformacaoemapasdoprocessodeprojetodeestruturasemconcretoarmadoumestudodecasoutilizandoametodologiaidm
_version_ 1709640947822755840
spelling oai:ojs.periodicos.sbu.unicamp.br:article-86345412019-06-17T15:21:35Z Information requirements and process maps for the reinforced concrete structures design: a case study using the idm methodology Requisitos de informação e mapas do processo de projeto de estruturas em concreto armado: um estudo de caso utilizando a metodologia IDM Antunes, Cristiano Eduardo Scheer, Sérgio Building Information Modeling. BIM. Information Delivery Manual. Information requirements. Structural design process. BIM. Modelagem da Informação da Construção. Construção. Projeto estrutural. Information Delivery Manual. The construction industry is facing the Building Information Modeling (BIM) paradigm and all its potential. In order to this paradigm becomes largely adopted and fully utilized, the interoperability issue must be properly addressed. While the IFC schema covers the data model necessary for data exchange, the processes occurring daily in the industry need to be better known. In this sense, this paper reports a research that explored the design process of reinforced concrete structures using BIM-based systems. To reach this goal, a case study was developed in a structural design company, where the researcher collected data by participant observation, interviews, and documental analysis. After the data collection and the analysis of the internal design routines and external communications during the design process, process maps were elaborated containing all the activities developed during the contracted projects. Furthermore, it was appropriately registered the information requirements for each one of the activities using the IDM (Information Delivery Manual) standards. It was possible to characterize the design process of reinforced concrete structures in the studied company when using BIM-based systems, as well as to identify the stakeholder information requirements. After the processes and information flow analysis it was also possible to propose a new optimized workflow. This workflow aimed to reduce the number of analogic activities during the studied design process, as well as helped to propose new information exchanges following the IDM methodology. The construction industry is facing the Building Information Modeling (BIM) paradigm and all its potential. In order to this paradigm becomes largely adopted and fully utilized, the interoperability issue must be properly addressed. While the IFC schema covers the data model necessary for data exchange, the processes occurring daily in the industry need to be better known. In this sense, this paper reports a research that explored the design process of reinforced concrete structures using BIM based systems. To reach this goal, a case study was developed in a structural design company, where the researcher collected data by participant observation, interviews and documental analysis. After the data collection and the analysis of the internal design routines and external communications during the design process, process maps were elaborated containing all the activities developed during the contracted projects. Furthermore, it was appropriately registered the information requirements for each one of the activities using the IDM (Information Delivery Manual) standards. It was possible to characterize the design process of reinforced concrete structures in the studied company when using BIM based systems, as well as to identify the stakeholder information requirements. After the processes and information flows analysis it was also possible to propose a new optimized workflow. This workflow aimed to reduce the number of analogic activities during the studied design process, as well as helped to propose new information exchanges following the IDM methodology. Universidade Estadual de Campinas 2014-06-30 info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion Case study application/pdf https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634541 10.20396/parc.v5i1.8634541 PARC Pesquisa em Arquitetura e Construção; Vol. 5 No. 1 (2014): Building Information Modeling; 18-34 PARC Pesquisa em Arquitetura e Construção; Vol. 5 Núm. 1 (2014): Building Information Modeling - BIM; 18-34 PARC Pesquisa em Arquitetura e Construção; v. 5 n. 1 (2014): Building Information Modeling - BIM; 18-34 1980-6809 por https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634541/2462 Copyright (c) 2018 PARC Pesquisa em Arquitetura e Construção