Analysis of the implementation process of bim in industrial and architectural design companies in Belo Horizonte
This paper presents an analysis of the Building Information Modeling implementation process in architectural and industrial design companies in Belo Horizonte. A field research was conducted interviewing professionals from industrial design and architectural design companies. The analysis was based...
সংরক্ষণ করুন:
প্রধান লেখক: | , |
---|---|
বিন্যাস: | Online |
ভাষা: | por |
প্রকাশিত: |
Universidade Estadual de Campinas
2014
|
অনলাইন ব্যবহার করুন: | https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634542 |
ট্যাগগুলো: |
ট্যাগ যুক্ত করুন
কোনো ট্যাগ নেই, প্রথমজন হিসাবে ট্যাগ করুন!
|
id |
oai:ojs.periodicos.sbu.unicamp.br:article-8634542 |
---|---|
record_format |
ojs |
institution |
Universidade Estadual de Campinas |
collection |
OJS |
language |
por |
format |
Online |
author |
Stehling, Miguel Pereira Arantes, Eduardo Marques |
spellingShingle |
Stehling, Miguel Pereira Arantes, Eduardo Marques Analysis of the implementation process of bim in industrial and architectural design companies in Belo Horizonte |
author_facet |
Stehling, Miguel Pereira Arantes, Eduardo Marques |
author_sort |
Stehling, Miguel Pereira |
title |
Analysis of the implementation process of bim in industrial and architectural design companies in Belo Horizonte |
title_short |
Analysis of the implementation process of bim in industrial and architectural design companies in Belo Horizonte |
title_full |
Analysis of the implementation process of bim in industrial and architectural design companies in Belo Horizonte |
title_fullStr |
Analysis of the implementation process of bim in industrial and architectural design companies in Belo Horizonte |
title_full_unstemmed |
Analysis of the implementation process of bim in industrial and architectural design companies in Belo Horizonte |
title_sort |
analysis of the implementation process of bim in industrial and architectural design companies in belo horizonte |
description |
This paper presents an analysis of the Building Information Modeling implementation process in architectural and industrial design companies in Belo Horizonte. A field research was conducted interviewing professionals from industrial design and architectural design companies. The analysis was based on companies’ characteristics and tools used. Also, it was evaluated how implementation occurred, resulting benefits, challenges faced and designers perception of the process. A diversified BIM tools use was observed in different specialties in industrial design while on the architectural design it was observed hegemony of tools. It was observed that the implementation of BIM, in the studied universe, is more developed in industrial design than in architectural design. Industrial design companies are already in the interoperability implementation stage, which is a higher BIM level than in architectural design companies. Architectural design companies are in the effort of leaving the traditional two-dimensional drawings towards parameterized 3D models. It was noted that industrial designers have a higher value perception regarding parametric issues than architectural designers. Regarding of major reasons for adopting BIM, the perception of value among industrial designers and architectural designers is similar.The perceptions of the barriers to the adoption of BIM are basically antagonistic for industrial and architectural designers. The most common way of software learning occurs through tutorials, forums, and collaboration between peers. Among the proposed improvements presented by the interviewees, it stands out the collaboration in team work and the commitment from the top management. |
publisher |
Universidade Estadual de Campinas |
publishDate |
2014 |
url |
https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634542 |
work_keys_str_mv |
AT stehlingmiguelpereira analysisoftheimplementationprocessofbiminindustrialandarchitecturaldesigncompaniesinbelohorizonte AT aranteseduardomarques analysisoftheimplementationprocessofbiminindustrialandarchitecturaldesigncompaniesinbelohorizonte AT stehlingmiguelpereira analisedoprocessodeimplantacaodebimemempresasdeprojetosindustriaisearquitetonicosembelohorizonte AT aranteseduardomarques analisedoprocessodeimplantacaodebimemempresasdeprojetosindustriaisearquitetonicosembelohorizonte |
_version_ |
1709640947954876416 |
spelling |
oai:ojs.periodicos.sbu.unicamp.br:article-86345422019-06-17T15:21:35Z Analysis of the implementation process of bim in industrial and architectural design companies in Belo Horizonte Análise do processo de implantação de BIM em empresas de projetos industriais e arquitetônicos em Belo Horizonte Stehling, Miguel Pereira Arantes, Eduardo Marques BIM. Industrial Design. Architectural Design. BIM. Modelagem da Informação da Construção. Construção. Projeto industrial. Projeto arquitetônico. This paper presents an analysis of the Building Information Modeling implementation process in architectural and industrial design companies in Belo Horizonte. A field research was conducted interviewing professionals from industrial design and architectural design companies. The analysis was based on companies’ characteristics and tools used. Also, it was evaluated how implementation occurred, resulting benefits, challenges faced and designers perception of the process. A diversified BIM tools use was observed in different specialties in industrial design while on the architectural design it was observed hegemony of tools. It was observed that the implementation of BIM, in the studied universe, is more developed in industrial design than in architectural design. Industrial design companies are already in the interoperability implementation stage, which is a higher BIM level than in architectural design companies. Architectural design companies are in the effort of leaving the traditional two-dimensional drawings towards parameterized 3D models. It was noted that industrial designers have a higher value perception regarding parametric issues than architectural designers. Regarding of major reasons for adopting BIM, the perception of value among industrial designers and architectural designers is similar.The perceptions of the barriers to the adoption of BIM are basically antagonistic for industrial and architectural designers. The most common way of software learning occurs through tutorials, forums, and collaboration between peers. Among the proposed improvements presented by the interviewees, it stands out the collaboration in team work and the commitment from the top management. This paper presents an analysis of the Building Information Modeling implementation process in architectural and industrial design companies in Belo Horizonte. A field research was conducted interviewing professionals from industrial design and architectural design companies. The analysis was based on companies’ characteristics and tools used. Also, it was evaluated how implementation occurred, resulting benefits, challenges faced and designers perception of the process. A diversified BIM tools use was observed in different specialties on industrial design while on architectural design it was observed hegemony of tools. It was observed that the implementation of BIM, in the studied universe, is more developed in industrial design than in architectural design. Industrial design companies are already in the interoperability implementation stage, which is a higher BIM level than in architectural design companies. Architectural design companies are in the effort of leaving the traditional two-dimensional drawings towards parameterized 3D models. It was noted that industrial designers have a higher value perception regarding to parametric issues than architectural designers. Regarding of major reasons for adopting BIM, the perception of value among industrial designers and architectural designers is similar.The perceptions on the barriers to the adoption of BIM are basically antagonic for industrial and architectural designers. The most common way of software learning occurs through tutorials, forums and collaboration between peers. Among the proposed improvements presented by the interviewees it stands out the collaboration in team work and the commitment from the top management. Universidade Estadual de Campinas 2014-06-30 info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion Field study application/pdf https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634542 10.20396/parc.v5i1.8634542 PARC Pesquisa em Arquitetura e Construção; Vol. 5 No. 1 (2014): Building Information Modeling; 35-44 PARC Pesquisa em Arquitetura e Construção; Vol. 5 Núm. 1 (2014): Building Information Modeling - BIM; 35-44 PARC Pesquisa em Arquitetura e Construção; v. 5 n. 1 (2014): Building Information Modeling - BIM; 35-44 1980-6809 por https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634542/2463 Copyright (c) 2018 PARC Pesquisa em Arquitetura e Construção |