Analysis of the implementation process of bim in industrial and architectural design companies in Belo Horizonte

This paper presents an analysis of the Building Information Modeling implementation process in architectural and industrial design companies in Belo Horizonte. A field research was conducted interviewing professionals from industrial design and architectural design companies. The analysis was based...

সম্পূর্ণ বিবরণ

সংরক্ষণ করুন:
গ্রন্থ-পঞ্জীর বিবরন
প্রধান লেখক: Stehling, Miguel Pereira, Arantes, Eduardo Marques
বিন্যাস: Online
ভাষা:por
প্রকাশিত: Universidade Estadual de Campinas 2014
অনলাইন ব্যবহার করুন:https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634542
ট্যাগগুলো: ট্যাগ যুক্ত করুন
কোনো ট্যাগ নেই, প্রথমজন হিসাবে ট্যাগ করুন!
id oai:ojs.periodicos.sbu.unicamp.br:article-8634542
record_format ojs
institution Universidade Estadual de Campinas
collection OJS
language por
format Online
author Stehling, Miguel Pereira
Arantes, Eduardo Marques
spellingShingle Stehling, Miguel Pereira
Arantes, Eduardo Marques
Analysis of the implementation process of bim in industrial and architectural design companies in Belo Horizonte
author_facet Stehling, Miguel Pereira
Arantes, Eduardo Marques
author_sort Stehling, Miguel Pereira
title Analysis of the implementation process of bim in industrial and architectural design companies in Belo Horizonte
title_short Analysis of the implementation process of bim in industrial and architectural design companies in Belo Horizonte
title_full Analysis of the implementation process of bim in industrial and architectural design companies in Belo Horizonte
title_fullStr Analysis of the implementation process of bim in industrial and architectural design companies in Belo Horizonte
title_full_unstemmed Analysis of the implementation process of bim in industrial and architectural design companies in Belo Horizonte
title_sort analysis of the implementation process of bim in industrial and architectural design companies in belo horizonte
description This paper presents an analysis of the Building Information Modeling implementation process in architectural and industrial design companies in Belo Horizonte. A field research was conducted interviewing professionals from industrial design and architectural design companies. The analysis was based on companies’ characteristics and tools used. Also, it was evaluated how implementation occurred, resulting benefits, challenges faced and designers perception of the process. A diversified BIM tools use was observed in different specialties in industrial design while on the architectural design it was observed hegemony of tools. It was observed that the implementation of BIM, in the studied universe, is more developed in industrial design than in architectural design. Industrial design companies are already in the interoperability implementation stage, which is a higher BIM level than in architectural design companies. Architectural design companies are in the effort of leaving the traditional two-dimensional drawings towards parameterized 3D models. It was noted that industrial designers have a higher value perception regarding parametric issues than architectural designers. Regarding of major reasons for adopting BIM, the perception of value among industrial designers and architectural designers is similar.The perceptions of the barriers to the adoption of BIM are basically antagonistic for industrial and architectural designers. The most common way of software learning occurs through tutorials, forums, and collaboration between peers. Among the proposed improvements presented by the interviewees, it stands out the collaboration in team work and the commitment from the top management.
publisher Universidade Estadual de Campinas
publishDate 2014
url https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634542
work_keys_str_mv AT stehlingmiguelpereira analysisoftheimplementationprocessofbiminindustrialandarchitecturaldesigncompaniesinbelohorizonte
AT aranteseduardomarques analysisoftheimplementationprocessofbiminindustrialandarchitecturaldesigncompaniesinbelohorizonte
AT stehlingmiguelpereira analisedoprocessodeimplantacaodebimemempresasdeprojetosindustriaisearquitetonicosembelohorizonte
AT aranteseduardomarques analisedoprocessodeimplantacaodebimemempresasdeprojetosindustriaisearquitetonicosembelohorizonte
_version_ 1709640947954876416
spelling oai:ojs.periodicos.sbu.unicamp.br:article-86345422019-06-17T15:21:35Z Analysis of the implementation process of bim in industrial and architectural design companies in Belo Horizonte Análise do processo de implantação de BIM em empresas de projetos industriais e arquitetônicos em Belo Horizonte Stehling, Miguel Pereira Arantes, Eduardo Marques BIM. Industrial Design. Architectural Design. BIM. Modelagem da Informação da Construção. Construção. Projeto industrial. Projeto arquitetônico. This paper presents an analysis of the Building Information Modeling implementation process in architectural and industrial design companies in Belo Horizonte. A field research was conducted interviewing professionals from industrial design and architectural design companies. The analysis was based on companies’ characteristics and tools used. Also, it was evaluated how implementation occurred, resulting benefits, challenges faced and designers perception of the process. A diversified BIM tools use was observed in different specialties in industrial design while on the architectural design it was observed hegemony of tools. It was observed that the implementation of BIM, in the studied universe, is more developed in industrial design than in architectural design. Industrial design companies are already in the interoperability implementation stage, which is a higher BIM level than in architectural design companies. Architectural design companies are in the effort of leaving the traditional two-dimensional drawings towards parameterized 3D models. It was noted that industrial designers have a higher value perception regarding parametric issues than architectural designers. Regarding of major reasons for adopting BIM, the perception of value among industrial designers and architectural designers is similar.The perceptions of the barriers to the adoption of BIM are basically antagonistic for industrial and architectural designers. The most common way of software learning occurs through tutorials, forums, and collaboration between peers. Among the proposed improvements presented by the interviewees, it stands out the collaboration in team work and the commitment from the top management. This paper presents an analysis of the Building Information Modeling implementation process in architectural and industrial design companies in Belo Horizonte. A field research was conducted interviewing professionals from industrial design and architectural design companies. The analysis was based on companies’ characteristics and tools used. Also, it was evaluated how implementation occurred, resulting benefits, challenges faced and designers perception of the process. A diversified BIM tools use was observed in different specialties on industrial design while on architectural design it was observed hegemony of tools. It was observed that the implementation of BIM, in the studied universe, is more developed in industrial design than in architectural design. Industrial design companies are already in the interoperability implementation stage, which is a higher BIM level than in architectural design companies. Architectural design companies are in the effort of leaving the traditional two-dimensional drawings towards parameterized 3D models. It was noted that industrial designers have a higher value perception regarding to parametric issues than architectural designers. Regarding of major reasons for adopting BIM, the perception of value among industrial designers and architectural designers is similar.The perceptions on the barriers to the adoption of BIM are basically antagonic for industrial and architectural designers. The most common way of software learning occurs through tutorials, forums and collaboration between peers. Among the proposed improvements presented by the interviewees it stands out the collaboration in team work and the commitment from the top management. Universidade Estadual de Campinas 2014-06-30 info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion Field study application/pdf https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634542 10.20396/parc.v5i1.8634542 PARC Pesquisa em Arquitetura e Construção; Vol. 5 No. 1 (2014): Building Information Modeling; 35-44 PARC Pesquisa em Arquitetura e Construção; Vol. 5 Núm. 1 (2014): Building Information Modeling - BIM; 35-44 PARC Pesquisa em Arquitetura e Construção; v. 5 n. 1 (2014): Building Information Modeling - BIM; 35-44 1980-6809 por https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634542/2463 Copyright (c) 2018 PARC Pesquisa em Arquitetura e Construção