BIM implementation within a medium-sized construction firm: a case study from modeling to quantity take-off
Information and Communication Technologies has been, in recent years, gaining ground in building construction. In Brazil, Building Information Modeling (BIM) adoption in construction firms around the country is an evidence of such growth. It first happened in firms near big economic centers; however...
Zapisane w:
Główni autorzy: | , , |
---|---|
Format: | Online |
Język: | por |
Wydane: |
Universidade Estadual de Campinas
2014
|
Dostęp online: | https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634543 |
Etykiety: |
Dodaj etykietę
Nie ma etykietki, Dołącz pierwszą etykiete!
|
id |
oai:ojs.periodicos.sbu.unicamp.br:article-8634543 |
---|---|
record_format |
ojs |
spelling |
oai:ojs.periodicos.sbu.unicamp.br:article-86345432019-06-17T15:21:35Z BIM implementation within a medium-sized construction firm: a case study from modeling to quantity take-off Implantação de BIM em uma construtora de médio porte: caso prático, da modelagem a quantificação Neiva Neto, Romeu da Silva Faria, Brayer Luiz de Bizello, Sérgio Adriano BIM. Implementation. Construction. Real State. BIM. Modelagem da Informação da Construção. Construção. Quantificação. Information and Communication Technologies has been, in recent years, gaining ground in building construction. In Brazil, Building Information Modeling (BIM) adoption in construction firms around the country is an evidence of such growth. It first happened in firms near big economic centers; however now interest is spreading throughout the rest of the territory. This article aims to explain briefly the steps taken for BIM Implementation at a corporate building project in Aparecida de Goiânia. The BIM implementation process was done in collaboration with the University of Campinas in an action research. The research applied modeling practices and model management activities to evaluate the benefits of a model-based approach at a construction firm design process. The accomplished benefits are relate to error reduction and omissions in design and the precision of quantity take-off in the estimate process. Information and Communication Technologies has been, in recent years, gaining ground in building construction. In Brazil, Building Information Modeling (BIM) adoption in construction firms around the country is an evidence of such growth. It first happened in firms near big economic centers; however now interest is spreading throughout the rest of the territory. This article aims to explain briefly the steps taken for BIM Implementation at a corporate building project in Aparecida de Goiânia. The BIM implementation process was done in collaboration with the University of Campinas in an action research. The research applied modeling practices and model management activities to evaluate the benefits of a model-based approach at a construction firm design process. The accomplished benefits are relate to error reduction and omissions in design and the precision of quantity take-off in the estimate process. Universidade Estadual de Campinas 2014-06-30 info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion Case study application/pdf https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634543 10.20396/parc.v5i1.8634543 PARC Pesquisa em Arquitetura e Construção; Vol. 5 No. 1 (2014): Building Information Modeling; 45-51 PARC Pesquisa em Arquitetura e Construção; Vol. 5 Núm. 1 (2014): Building Information Modeling - BIM; 45-51 PARC Pesquisa em Arquitetura e Construção; v. 5 n. 1 (2014): Building Information Modeling - BIM; 45-51 1980-6809 por https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634543/2464 Copyright (c) 2018 PARC Pesquisa em Arquitetura e Construção |
institution |
Universidade Estadual de Campinas |
collection |
OJS |
language |
por |
format |
Online |
author |
Neiva Neto, Romeu da Silva Faria, Brayer Luiz de Bizello, Sérgio Adriano |
spellingShingle |
Neiva Neto, Romeu da Silva Faria, Brayer Luiz de Bizello, Sérgio Adriano BIM implementation within a medium-sized construction firm: a case study from modeling to quantity take-off |
author_facet |
Neiva Neto, Romeu da Silva Faria, Brayer Luiz de Bizello, Sérgio Adriano |
author_sort |
Neiva Neto, Romeu da Silva |
title |
BIM implementation within a medium-sized construction firm: a case study from modeling to quantity take-off |
title_short |
BIM implementation within a medium-sized construction firm: a case study from modeling to quantity take-off |
title_full |
BIM implementation within a medium-sized construction firm: a case study from modeling to quantity take-off |
title_fullStr |
BIM implementation within a medium-sized construction firm: a case study from modeling to quantity take-off |
title_full_unstemmed |
BIM implementation within a medium-sized construction firm: a case study from modeling to quantity take-off |
title_sort |
bim implementation within a medium-sized construction firm: a case study from modeling to quantity take-off |
description |
Information and Communication Technologies has been, in recent years, gaining ground in building construction. In Brazil, Building Information Modeling (BIM) adoption in construction firms around the country is an evidence of such growth. It first happened in firms near big economic centers; however now interest is spreading throughout the rest of the territory. This article aims to explain briefly the steps taken for BIM Implementation at a corporate building project in Aparecida de Goiânia. The BIM implementation process was done in collaboration with the University of Campinas in an action research. The research applied modeling practices and model management activities to evaluate the benefits of a model-based approach at a construction firm design process. The accomplished benefits are relate to error reduction and omissions in design and the precision of quantity take-off in the estimate process. |
publisher |
Universidade Estadual de Campinas |
publishDate |
2014 |
url |
https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8634543 |
work_keys_str_mv |
AT neivanetoromeudasilva bimimplementationwithinamediumsizedconstructionfirmacasestudyfrommodelingtoquantitytakeoff AT fariabrayerluizde bimimplementationwithinamediumsizedconstructionfirmacasestudyfrommodelingtoquantitytakeoff AT bizellosergioadriano bimimplementationwithinamediumsizedconstructionfirmacasestudyfrommodelingtoquantitytakeoff AT neivanetoromeudasilva implantacaodebimemumaconstrutorademedioportecasopraticodamodelagemaquantificacao AT fariabrayerluizde implantacaodebimemumaconstrutorademedioportecasopraticodamodelagemaquantificacao AT bizellosergioadriano implantacaodebimemumaconstrutorademedioportecasopraticodamodelagemaquantificacao |
_version_ |
1709640948071268352 |