BIM 4D in construction scheduling: details, benefits and difficulties
The Plan of Construction Operations (PCO) subsidizes the fulfillment of the cost, term and the expected quality of the work. These have a direct influence on the productivity obtained at the construction site, since information flaw from the generated documentation is interpreted as the main cause-a...
Shranjeno v:
| Main Authors: | , , |
|---|---|
| Format: | Online |
| Jezik: | por |
| Izdano: |
Universidade Estadual de Campinas
2019
|
| Online dostop: | https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8650258 |
| Oznake: |
Označite
Brez oznak, prvi označite!
|