BIM 4D in construction scheduling: details, benefits and difficulties
The Plan of Construction Operations (PCO) subsidizes the fulfillment of the cost, term and the expected quality of the work. These have a direct influence on the productivity obtained at the construction site, since information flaw from the generated documentation is interpreted as the main cause-a...
Saved in:
Main Authors: | Silva, Paula Heloisa da, Crippa, Julianna, Scheer, Sergio |
---|---|
Formáid: | Online |
Teanga: | por |
Foilsithe: |
Universidade Estadual de Campinas
2019
|
Rochtain Ar Líne: | https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8650258 |
Clibeanna: |
Cuir Clib Leis
Gan Chlibeanna, Bí ar an gcéad duine leis an taifead seo a chlibeáil!
|
Míreanna Comhchosúla
-
Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs
le: Santos, Mírian Caroline Farias, et al.
Foilsithe: (2021) -
Analysis of quantities from a BIM 5D model to attend a budget process of civil construction companies
le: Latreille, Denise, et al.
Foilsithe: (2020) -
Implementation of virtual construction to improve the planning of works. Use of 4d model in urbanism located in Valencia, Venezuela
le: Giménez, Zulay, et al.
Foilsithe: (2017) -
BIM 4D aplicado à gestão logística: implementação na montagem de sistemas pré-fabricados de concreto engineer-to-order
le: Bataglin, Fernanda Saidelles, et al.
Foilsithe: (2017) -
Avaliação de estratégias para representação e análise do planejamento e controle de obras utilizando modelos BIM 4D
le: Brito, Douglas Malheiro de, et al.
Foilsithe: (2015)