BIM 4D in construction scheduling: details, benefits and difficulties
The Plan of Construction Operations (PCO) subsidizes the fulfillment of the cost, term and the expected quality of the work. These have a direct influence on the productivity obtained at the construction site, since information flaw from the generated documentation is interpreted as the main cause-a...
Αποθηκεύτηκε σε:
Κύριοι συγγραφείς: | , , |
---|---|
Μορφή: | Online |
Γλώσσα: | por |
Έκδοση: |
Universidade Estadual de Campinas
2019
|
Διαθέσιμο Online: | https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8650258 |
Ετικέτες: |
Προσθήκη ετικέτας
Δεν υπάρχουν, Καταχωρήστε ετικέτα πρώτοι!
|