BIM 4D in construction scheduling: details, benefits and difficulties

The Plan of Construction Operations (PCO) subsidizes the fulfillment of the cost, term and the expected quality of the work. These have a direct influence on the productivity obtained at the construction site, since information flaw from the generated documentation is interpreted as the main cause-a...

Cur síos iomlán

Saved in:
Sonraí Bibleagrafaíochta
Main Authors: Silva, Paula Heloisa da, Crippa, Julianna, Scheer, Sergio
Formáid: Online
Teanga:por
Foilsithe: Universidade Estadual de Campinas 2019
Rochtain Ar Líne:https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8650258
Clibeanna: Cuir Clib Leis
Gan Chlibeanna, Bí ar an gcéad duine leis an taifead seo a chlibeáil!