BIM 4D in construction scheduling: details, benefits and difficulties
The Plan of Construction Operations (PCO) subsidizes the fulfillment of the cost, term and the expected quality of the work. These have a direct influence on the productivity obtained at the construction site, since information flaw from the generated documentation is interpreted as the main cause-a...
שמור ב:
Main Authors: | , , |
---|---|
פורמט: | Online |
שפה: | por |
יצא לאור: |
Universidade Estadual de Campinas
2019
|
גישה מקוונת: | https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8650258 |
תגים: |
הוספת תג
אין תגיות, היה/י הראשונ/ה לתייג את הרשומה!
|