BIM 4D in construction scheduling: details, benefits and difficulties
The Plan of Construction Operations (PCO) subsidizes the fulfillment of the cost, term and the expected quality of the work. These have a direct influence on the productivity obtained at the construction site, since information flaw from the generated documentation is interpreted as the main cause-a...
保存先:
主要な著者: | , , |
---|---|
フォーマット: | Online |
言語: | por |
出版事項: |
Universidade Estadual de Campinas
2019
|
オンライン・アクセス: | https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8650258 |
タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|