BIM 4D in construction scheduling: details, benefits and difficulties
The Plan of Construction Operations (PCO) subsidizes the fulfillment of the cost, term and the expected quality of the work. These have a direct influence on the productivity obtained at the construction site, since information flaw from the generated documentation is interpreted as the main cause-a...
Saved in:
Main Authors: | , , |
---|---|
格式: | Online |
语言: | por |
出版: |
Universidade Estadual de Campinas
2019
|
在线阅读: | https://periodicos.sbu.unicamp.br/ojs/index.php/parc/article/view/8650258 |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|