The AEG and the installation of a modernizer view in Chile
This paper proposes an alternative vision of the entrance of the modern project related to the presence of the German firm AEG (Allgemeine Elektricitäts-Gesellschaft) and the inescapable link of this company with the figure of the German architect and designer Peter Behrens, one of the main drivers...
Gespeichert in:
| Hauptverfasser: | Vera, Rodrigo, Harris, Ronald, Bascuñán, Patricio |
|---|---|
| Format: | Online |
| Sprache: | spa |
| Veröffentlicht: |
Universidad Diego Portales
2019
|
| Online Zugang: | https://www.revista180.udp.cl/index.php/revista180/article/view/564 |
| Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Ähnliche Einträge
-
FEASIBILITY STUDY OF FOTOVOLTAIC SYSTEMS INSTALLATION IN TYPICAL HOUSES OF CIUDAD AUTONOMA DE BUENOS AIRES
von: Pilar, Claudia; Facultad de Ingeniería y Facultad de Arquitectura, UNNE, et al.
Veröffentlicht: (2019) -
Guidelines for the improvement of design, procurement and installation of lifts using supply chain management concepts
von: Azambuja, Marcelo Marcelo Menna Barreto, et al.
Veröffentlicht: (2008) -
Evaluation of the installed power of the pump equipment in the acuifero of the Sicarigua valley Municipio Torres / Lara Estate
von: López, Alirio Segundo, et al.
Veröffentlicht: (2006) -
Stylistic contaminations in the work of Luciano Kulczewski. Juxtaposition of imageries as appropriation strategy
von: Harris Diez, Ronald Ernesto
Veröffentlicht: (2018) -
Build the city: modernity and neo-rationalism between symbolism and functionality. A view from Europe to the architecture of Latin America
von: Vivas Ziarrusta, Isusko
Veröffentlicht: (2016)