The instrumental role of the urban project in the monumentalization and securitization of the Vila Olímpica de Barcelona
The Olympic Village is the emblematic project of the Barcelona urban reform promoted with the 1992 Olympic Games. It was built on an industrial area, which implied the destruction of the architectural heritage and the eviction of the residents of the working class neighborhood that inhabited the are...
Gardado en:
Autor Principal: | Navas Perrone, María Gabriela |
---|---|
Formato: | Online |
Idioma: | spa |
Publicado: |
UNIVERSIDAD ANTONIO NARIÑO
2019
|
Acceso en liña: | https://revistas.uan.edu.co/index.php/nodo/article/view/165 |
Tags: |
Engadir etiqueta
Sen Etiquetas, Sexa o primeiro en etiquetar este rexistro!
|
Títulos similares
-
The urban regeneration implemented in Guayaquil and Barcelona. Unveiling the project rhetoric of public space
por: Navas Perrone, María Gabriela
Publicado: (2019) -
A vila olímpica de roma 1960-2011: por um reconhecimento histórico-crítico
por: Salvo, Simona
Publicado: (2012) -
Vila Autódromo in dispute: subjects, instruments and strategies to reinvent the space | Vila Autódromo em disputa: sujeitos, instrumentos e estratégias para a reinvenção do espaço
por: Sánchez, Fernanda, et al.
Publicado: (2016) -
Foldings, unfoldings and refoldings. Pedagogy for the project and instruments of ideation
por: Chiarella, Mauro
Publicado: (2011) -
Instrumental Model for Complex Projects. Academic Value Proposal Polyhedron
por: Mollenhauer, Katherine, et al.
Publicado: (2020)