Integrated design of industrialized building systems: The Technology Center of the Sarah Network - CTRS, Brazil

The design process of a building should be a collective activity, with the participation of different specialties. In these processes, an effective coordination is necessary to foster interactivity among design team. In Brazil, the hospital design process developed by architect João Filgueiras Lima...

全面介绍

Saved in:
书目详细资料
Main Authors: Lukiantchuki, Marieli Azoia, Caixeta, Michele Caroline Bueno Ferrari, Fabricio, Márcio Minto
格式: Online
语言:eng
出版: Universidade de São Paulo. Instituto de Arquitetura e Urbanismo 2015
在线阅读:https://www.revistas.usp.br/gestaodeprojetos/article/view/95913
标签: 添加标签
没有标签, 成为第一个标记此记录!
实物特征
总结:The design process of a building should be a collective activity, with the participation of different specialties. In these processes, an effective coordination is necessary to foster interactivity among design team. In Brazil, the hospital design process developed by architect João Filgueiras Lima at the Technology Center of The Sarah Network of Rehabilitation Hospitals (CTRS) is was important example of integrated design to industrialized buildings, by encompassing all stages of the built process. The CTRS was an innovative experience of construction industrialization in Brazil, and also a major center for research. The present study analyzes the integrated design process at the CTRS, through a case study, based on direct observations, guided visits, survey of data in the CTRS design collection and interviews with architect João Filgueiras Lima, known as  Lelé and professionals of his team. The results show the development of all stages of the building in the CTRS, from the planning to the maintenance, which facilitates the design process and improves the building functioning.