A quantitative analysis of production planning and control metrics: impacts of the Last Planner System and factors that affect its effectiveness
Much effort has been made for improving the performance of the production planning and control process in the construction industry through the implementation of the Last Planner System of Production Control (LPS). Despite the wide dissemination of Last Planner in different countries, very few quan...
محفوظ في:
المؤلفون الرئيسيون: | Moura, Camile Borges, Formoso, Carlos Torres |
---|---|
التنسيق: | Online |
اللغة: | por |
منشور في: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2009
|
الوصول للمادة أونلاين: | https://seer.ufrgs.br/ambienteconstruido/article/view/7695 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Uma proposta de integração do modelo BIM ao sistema last planner
بواسطة: Rodrigues, Priscilla Borges de Freitas, وآخرون
منشور في: (2018) -
SOCIO-SPATIAL CONTROL PRACTICES AND ITS EFFECTS ON THE TERRITORY
بواسطة: Quintero Pérez, Gloria Isabel
منشور في: (2008) -
Planejamento tradicional, Location-Based Management System e Last Planner System: um modelo integrado
بواسطة: Olivieri, Hylton, وآخرون
منشور في: (2015) -
Sky view factor and the heat island effect in Valparaiso
بواسطة: Carrasco, Claudio, وآخرون
منشور في: (2016) -
Light and its effects. Experiences
بواسطة: Quintero López, Enrique
منشور في: (2016)