A quantitative analysis of production planning and control metrics: impacts of the Last Planner System and factors that affect its effectiveness
Much effort has been made for improving the performance of the production planning and control process in the construction industry through the implementation of the Last Planner System of Production Control (LPS). Despite the wide dissemination of Last Planner in different countries, very few quan...
Uloženo v:
Hlavní autoři: | Moura, Camile Borges, Formoso, Carlos Torres |
---|---|
Médium: | Online |
Jazyk: | por |
Vydáno: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2009
|
On-line přístup: | https://seer.ufrgs.br/ambienteconstruido/article/view/7695 |
Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo otaguje tento záznam!
|
Podobné jednotky
-
Uma proposta de integração do modelo BIM ao sistema last planner
Autor: Rodrigues, Priscilla Borges de Freitas, a další
Vydáno: (2018) -
SOCIO-SPATIAL CONTROL PRACTICES AND ITS EFFECTS ON THE TERRITORY
Autor: Quintero Pérez, Gloria Isabel
Vydáno: (2008) -
Planejamento tradicional, Location-Based Management System e Last Planner System: um modelo integrado
Autor: Olivieri, Hylton, a další
Vydáno: (2015) -
Sky view factor and the heat island effect in Valparaiso
Autor: Carrasco, Claudio, a další
Vydáno: (2016) -
Light and its effects. Experiences
Autor: Quintero López, Enrique
Vydáno: (2016)