A quantitative analysis of production planning and control metrics: impacts of the Last Planner System and factors that affect its effectiveness
Much effort has been made for improving the performance of the production planning and control process in the construction industry through the implementation of the Last Planner System of Production Control (LPS). Despite the wide dissemination of Last Planner in different countries, very few quan...
Bewaard in:
Hoofdauteurs: | Moura, Camile Borges, Formoso, Carlos Torres |
---|---|
Formaat: | Online |
Taal: | por |
Gepubliceerd in: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2009
|
Online toegang: | https://seer.ufrgs.br/ambienteconstruido/article/view/7695 |
Tags: |
Voeg label toe
Geen labels, Wees de eerste die dit record labelt!
|
Gelijkaardige items
-
Uma proposta de integração do modelo BIM ao sistema last planner
door: Rodrigues, Priscilla Borges de Freitas, et al.
Gepubliceerd in: (2018) -
SOCIO-SPATIAL CONTROL PRACTICES AND ITS EFFECTS ON THE TERRITORY
door: Quintero Pérez, Gloria Isabel
Gepubliceerd in: (2008) -
Planejamento tradicional, Location-Based Management System e Last Planner System: um modelo integrado
door: Olivieri, Hylton, et al.
Gepubliceerd in: (2015) -
Sky view factor and the heat island effect in Valparaiso
door: Carrasco, Claudio, et al.
Gepubliceerd in: (2016) -
Light and its effects. Experiences
door: Quintero López, Enrique
Gepubliceerd in: (2016)