A quantitative analysis of production planning and control metrics: impacts of the Last Planner System and factors that affect its effectiveness
Much effort has been made for improving the performance of the production planning and control process in the construction industry through the implementation of the Last Planner System of Production Control (LPS). Despite the wide dissemination of Last Planner in different countries, very few quan...
Сохранить в:
Главные авторы: | Moura, Camile Borges, Formoso, Carlos Torres |
---|---|
Формат: | Online |
Язык: | por |
Опубликовано: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2009
|
Online-ссылка: | https://seer.ufrgs.br/ambienteconstruido/article/view/7695 |
Метки: |
Добавить метку
Нет меток, Требуется 1-ая метка записи!
|
Схожие документы
-
Uma proposta de integração do modelo BIM ao sistema last planner
по: Rodrigues, Priscilla Borges de Freitas, et al.
Опубликовано: (2018) -
SOCIO-SPATIAL CONTROL PRACTICES AND ITS EFFECTS ON THE TERRITORY
по: Quintero Pérez, Gloria Isabel
Опубликовано: (2008) -
Planejamento tradicional, Location-Based Management System e Last Planner System: um modelo integrado
по: Olivieri, Hylton, et al.
Опубликовано: (2015) -
Sky view factor and the heat island effect in Valparaiso
по: Carrasco, Claudio, et al.
Опубликовано: (2016) -
Light and its effects. Experiences
по: Quintero López, Enrique
Опубликовано: (2016)