A quantitative analysis of production planning and control metrics: impacts of the Last Planner System and factors that affect its effectiveness
Much effort has been made for improving the performance of the production planning and control process in the construction industry through the implementation of the Last Planner System of Production Control (LPS). Despite the wide dissemination of Last Planner in different countries, very few quan...
Sparad:
Huvudupphovsmän: | Moura, Camile Borges, Formoso, Carlos Torres |
---|---|
Materialtyp: | Online |
Språk: | por |
Publicerad: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2009
|
Länkar: | https://seer.ufrgs.br/ambienteconstruido/article/view/7695 |
Taggar: |
Lägg till en tagg
Inga taggar, Lägg till första taggen!
|
Liknande verk
-
Uma proposta de integração do modelo BIM ao sistema last planner
av: Rodrigues, Priscilla Borges de Freitas, et al.
Publicerad: (2018) -
SOCIO-SPATIAL CONTROL PRACTICES AND ITS EFFECTS ON THE TERRITORY
av: Quintero Pérez, Gloria Isabel
Publicerad: (2008) -
Planejamento tradicional, Location-Based Management System e Last Planner System: um modelo integrado
av: Olivieri, Hylton, et al.
Publicerad: (2015) -
Sky view factor and the heat island effect in Valparaiso
av: Carrasco, Claudio, et al.
Publicerad: (2016) -
Light and its effects. Experiences
av: Quintero López, Enrique
Publicerad: (2016)