Construction duration predictive model based on factorial analysis and fuzzy logic
Setting the building construction duration for vertical residential works is made still in the study phase of economic and financial feasibility of the project and, in most cases, in an empirical way, increasing the uncertainties and the risks to fulfill the set deadline. However, there are computat...
        Sparad:
      
    
                  | Huvudupphovsmän: | Maués, Luiz Maurício Furtado, Sá, José Alberto Silva de, Costa Junior, Carlos Tavares da, Kern, Andrea Parise, Duarte, André Augusto Azevedo Montenegro | 
|---|---|
| Materialtyp: | Online | 
| Språk: | eng | 
| Publicerad: | ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
    
      2019 | 
| Länkar: | https://seer.ufrgs.br/ambienteconstruido/article/view/79907 | 
| Taggar: | Lägg till en tagg 
      Inga taggar, Lägg till första taggen!
   | 
Liknande verk
- 
                
        
          Reintegration of the Factory to the City, through the Parasitism and Urban Regeneration        
                  
 av: Andica Pérez, Luis Felipe, et al.
 Publicerad: (2020)
- 
                
        
          Comparison of machine learning techniques for predicting energy loads in buildings        
                  
 av: Duarte, Grasiele Regina, et al.
 Publicerad: (2017)
- 
                
        
          Construction delays: a case study in the Brazilian Amazon        
                  
 av: Maués, Luiz Mauricio Furtado, et al.
 Publicerad: (2017)
- 
                
        
           Research and creativity :a factory of special ideas        
                  
 av: Díaz Moreno, Cristina, et al.
 Publicerad: (2007)
- 
                
        
          Domus method for predicting sunlit areas on interior surfaces        
                  
 av: Rocha, Ana Paula de Almeida, et al.
 Publicerad: (2018)