Construction duration predictive model based on factorial analysis and fuzzy logic
Setting the building construction duration for vertical residential works is made still in the study phase of economic and financial feasibility of the project and, in most cases, in an empirical way, increasing the uncertainties and the risks to fulfill the set deadline. However, there are computat...
Na minha lista:
Principais autores: | Maués, Luiz Maurício Furtado, Sá, José Alberto Silva de, Costa Junior, Carlos Tavares da, Kern, Andrea Parise, Duarte, André Augusto Azevedo Montenegro |
---|---|
Formato: | Online |
Idioma: | eng |
Publicado em: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2019
|
Acesso em linha: | https://seer.ufrgs.br/ambienteconstruido/article/view/79907 |
Tags: |
Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
|
Registros relacionados
-
Reintegration of the Factory to the City, through the Parasitism and Urban Regeneration
por: Andica Pérez, Luis Felipe, et al.
Publicado em: (2020) -
Comparison of machine learning techniques for predicting energy loads in buildings
por: Duarte, Grasiele Regina, et al.
Publicado em: (2017) -
Construction delays: a case study in the Brazilian Amazon
por: Maués, Luiz Mauricio Furtado, et al.
Publicado em: (2017) -
Research and creativity :a factory of special ideas
por: Díaz Moreno, Cristina, et al.
Publicado em: (2007) -
Domus method for predicting sunlit areas on interior surfaces
por: Rocha, Ana Paula de Almeida, et al.
Publicado em: (2018)