Construction duration predictive model based on factorial analysis and fuzzy logic
Setting the building construction duration for vertical residential works is made still in the study phase of economic and financial feasibility of the project and, in most cases, in an empirical way, increasing the uncertainties and the risks to fulfill the set deadline. However, there are computat...
Uloženo v:
Hlavní autoři: | Maués, Luiz Maurício Furtado, Sá, José Alberto Silva de, Costa Junior, Carlos Tavares da, Kern, Andrea Parise, Duarte, André Augusto Azevedo Montenegro |
---|---|
Médium: | Online |
Jazyk: | eng |
Vydáno: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2019
|
On-line přístup: | https://seer.ufrgs.br/ambienteconstruido/article/view/79907 |
Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo otaguje tento záznam!
|
Podobné jednotky
-
Reintegration of the Factory to the City, through the Parasitism and Urban Regeneration
Autor: Andica Pérez, Luis Felipe, a další
Vydáno: (2020) -
Comparison of machine learning techniques for predicting energy loads in buildings
Autor: Duarte, Grasiele Regina, a další
Vydáno: (2017) -
Construction delays: a case study in the Brazilian Amazon
Autor: Maués, Luiz Mauricio Furtado, a další
Vydáno: (2017) -
Research and creativity :a factory of special ideas
Autor: Díaz Moreno, Cristina, a další
Vydáno: (2007) -
Domus method for predicting sunlit areas on interior surfaces
Autor: Rocha, Ana Paula de Almeida, a další
Vydáno: (2018)