Construction duration predictive model based on factorial analysis and fuzzy logic
Setting the building construction duration for vertical residential works is made still in the study phase of economic and financial feasibility of the project and, in most cases, in an empirical way, increasing the uncertainties and the risks to fulfill the set deadline. However, there are computat...
Gardado en:
Main Authors: | Maués, Luiz Maurício Furtado, Sá, José Alberto Silva de, Costa Junior, Carlos Tavares da, Kern, Andrea Parise, Duarte, André Augusto Azevedo Montenegro |
---|---|
Formato: | Online |
Idioma: | eng |
Publicado: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2019
|
Acceso en liña: | https://seer.ufrgs.br/ambienteconstruido/article/view/79907 |
Tags: |
Engadir etiqueta
Sen Etiquetas, Sexa o primeiro en etiquetar este rexistro!
|
Títulos similares
-
Reintegration of the Factory to the City, through the Parasitism and Urban Regeneration
por: Andica Pérez, Luis Felipe, et al.
Publicado: (2020) -
Comparison of machine learning techniques for predicting energy loads in buildings
por: Duarte, Grasiele Regina, et al.
Publicado: (2017) -
Construction delays: a case study in the Brazilian Amazon
por: Maués, Luiz Mauricio Furtado, et al.
Publicado: (2017) -
Research and creativity :a factory of special ideas
por: Díaz Moreno, Cristina, et al.
Publicado: (2007) -
Domus method for predicting sunlit areas on interior surfaces
por: Rocha, Ana Paula de Almeida, et al.
Publicado: (2018)