Construction duration predictive model based on factorial analysis and fuzzy logic
Setting the building construction duration for vertical residential works is made still in the study phase of economic and financial feasibility of the project and, in most cases, in an empirical way, increasing the uncertainties and the risks to fulfill the set deadline. However, there are computat...
שמור ב:
Main Authors: | Maués, Luiz Maurício Furtado, Sá, José Alberto Silva de, Costa Junior, Carlos Tavares da, Kern, Andrea Parise, Duarte, André Augusto Azevedo Montenegro |
---|---|
פורמט: | Online |
שפה: | eng |
יצא לאור: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2019
|
גישה מקוונת: | https://seer.ufrgs.br/ambienteconstruido/article/view/79907 |
תגים: |
הוספת תג
אין תגיות, היה/י הראשונ/ה לתייג את הרשומה!
|
פריטים דומים
-
Reintegration of the Factory to the City, through the Parasitism and Urban Regeneration
מאת: Andica Pérez, Luis Felipe, et al.
יצא לאור: (2020) -
Comparison of machine learning techniques for predicting energy loads in buildings
מאת: Duarte, Grasiele Regina, et al.
יצא לאור: (2017) -
Construction delays: a case study in the Brazilian Amazon
מאת: Maués, Luiz Mauricio Furtado, et al.
יצא לאור: (2017) -
Research and creativity :a factory of special ideas
מאת: Díaz Moreno, Cristina, et al.
יצא לאור: (2007) -
Domus method for predicting sunlit areas on interior surfaces
מאת: Rocha, Ana Paula de Almeida, et al.
יצא לאור: (2018)