Construction duration predictive model based on factorial analysis and fuzzy logic
Setting the building construction duration for vertical residential works is made still in the study phase of economic and financial feasibility of the project and, in most cases, in an empirical way, increasing the uncertainties and the risks to fulfill the set deadline. However, there are computat...
保存先:
主要な著者: | Maués, Luiz Maurício Furtado, Sá, José Alberto Silva de, Costa Junior, Carlos Tavares da, Kern, Andrea Parise, Duarte, André Augusto Azevedo Montenegro |
---|---|
フォーマット: | Online |
言語: | eng |
出版事項: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2019
|
オンライン・アクセス: | https://seer.ufrgs.br/ambienteconstruido/article/view/79907 |
タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|
類似資料
-
Reintegration of the Factory to the City, through the Parasitism and Urban Regeneration
著者:: Andica Pérez, Luis Felipe, 等
出版事項: (2020) -
Comparison of machine learning techniques for predicting energy loads in buildings
著者:: Duarte, Grasiele Regina, 等
出版事項: (2017) -
Construction delays: a case study in the Brazilian Amazon
著者:: Maués, Luiz Mauricio Furtado, 等
出版事項: (2017) -
Research and creativity :a factory of special ideas
著者:: Díaz Moreno, Cristina, 等
出版事項: (2007) -
Domus method for predicting sunlit areas on interior surfaces
著者:: Rocha, Ana Paula de Almeida, 等
出版事項: (2018)