Construction duration predictive model based on factorial analysis and fuzzy logic
Setting the building construction duration for vertical residential works is made still in the study phase of economic and financial feasibility of the project and, in most cases, in an empirical way, increasing the uncertainties and the risks to fulfill the set deadline. However, there are computat...
Сохранить в:
Главные авторы: | Maués, Luiz Maurício Furtado, Sá, José Alberto Silva de, Costa Junior, Carlos Tavares da, Kern, Andrea Parise, Duarte, André Augusto Azevedo Montenegro |
---|---|
Формат: | Online |
Язык: | eng |
Опубликовано: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2019
|
Online-ссылка: | https://seer.ufrgs.br/ambienteconstruido/article/view/79907 |
Метки: |
Добавить метку
Нет меток, Требуется 1-ая метка записи!
|
Схожие документы
-
Reintegration of the Factory to the City, through the Parasitism and Urban Regeneration
по: Andica Pérez, Luis Felipe, et al.
Опубликовано: (2020) -
Comparison of machine learning techniques for predicting energy loads in buildings
по: Duarte, Grasiele Regina, et al.
Опубликовано: (2017) -
Construction delays: a case study in the Brazilian Amazon
по: Maués, Luiz Mauricio Furtado, et al.
Опубликовано: (2017) -
Research and creativity :a factory of special ideas
по: Díaz Moreno, Cristina, et al.
Опубликовано: (2007) -
Domus method for predicting sunlit areas on interior surfaces
по: Rocha, Ana Paula de Almeida, et al.
Опубликовано: (2018)