Construction duration predictive model based on factorial analysis and fuzzy logic
Setting the building construction duration for vertical residential works is made still in the study phase of economic and financial feasibility of the project and, in most cases, in an empirical way, increasing the uncertainties and the risks to fulfill the set deadline. However, there are computat...
Sparad:
Huvudupphovsmän: | Maués, Luiz Maurício Furtado, Sá, José Alberto Silva de, Costa Junior, Carlos Tavares da, Kern, Andrea Parise, Duarte, André Augusto Azevedo Montenegro |
---|---|
Materialtyp: | Online |
Språk: | eng |
Publicerad: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2019
|
Länkar: | https://seer.ufrgs.br/ambienteconstruido/article/view/79907 |
Taggar: |
Lägg till en tagg
Inga taggar, Lägg till första taggen!
|
Liknande verk
-
Reintegration of the Factory to the City, through the Parasitism and Urban Regeneration
av: Andica Pérez, Luis Felipe, et al.
Publicerad: (2020) -
Comparison of machine learning techniques for predicting energy loads in buildings
av: Duarte, Grasiele Regina, et al.
Publicerad: (2017) -
Construction delays: a case study in the Brazilian Amazon
av: Maués, Luiz Mauricio Furtado, et al.
Publicerad: (2017) -
Research and creativity :a factory of special ideas
av: Díaz Moreno, Cristina, et al.
Publicerad: (2007) -
Domus method for predicting sunlit areas on interior surfaces
av: Rocha, Ana Paula de Almeida, et al.
Publicerad: (2018)