Construction duration predictive model based on factorial analysis and fuzzy logic
Setting the building construction duration for vertical residential works is made still in the study phase of economic and financial feasibility of the project and, in most cases, in an empirical way, increasing the uncertainties and the risks to fulfill the set deadline. However, there are computat...
Kaydedildi:
| Asıl Yazarlar: | Maués, Luiz Maurício Furtado, Sá, José Alberto Silva de, Costa Junior, Carlos Tavares da, Kern, Andrea Parise, Duarte, André Augusto Azevedo Montenegro |
|---|---|
| Materyal Türü: | Online |
| Dil: | eng |
| Baskı/Yayın Bilgisi: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2019
|
| Online Erişim: | https://seer.ufrgs.br/ambienteconstruido/article/view/79907 |
| Etiketler: |
Etiketle
Etiket eklenmemiş, İlk siz ekleyin!
|
Benzer Materyaller
-
Reintegration of the Factory to the City, through the Parasitism and Urban Regeneration
Yazar:: Andica Pérez, Luis Felipe, ve diğerleri
Baskı/Yayın Bilgisi: (2020) -
Comparison of machine learning techniques for predicting energy loads in buildings
Yazar:: Duarte, Grasiele Regina, ve diğerleri
Baskı/Yayın Bilgisi: (2017) -
Construction delays: a case study in the Brazilian Amazon
Yazar:: Maués, Luiz Mauricio Furtado, ve diğerleri
Baskı/Yayın Bilgisi: (2017) -
Research and creativity :a factory of special ideas
Yazar:: Díaz Moreno, Cristina, ve diğerleri
Baskı/Yayın Bilgisi: (2007) -
Domus method for predicting sunlit areas on interior surfaces
Yazar:: Rocha, Ana Paula de Almeida, ve diğerleri
Baskı/Yayın Bilgisi: (2018)