Construction duration predictive model based on factorial analysis and fuzzy logic
Setting the building construction duration for vertical residential works is made still in the study phase of economic and financial feasibility of the project and, in most cases, in an empirical way, increasing the uncertainties and the risks to fulfill the set deadline. However, there are computat...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Online |
Sprache: | eng |
Veröffentlicht: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2019
|
Online Zugang: | https://seer.ufrgs.br/ambienteconstruido/article/view/79907 |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|