Construction duration predictive model based on factorial analysis and fuzzy logic

Setting the building construction duration for vertical residential works is made still in the study phase of economic and financial feasibility of the project and, in most cases, in an empirical way, increasing the uncertainties and the risks to fulfill the set deadline. However, there are computat...

全面介绍

Saved in:
书目详细资料
Main Authors: Maués, Luiz Maurício Furtado, Sá, José Alberto Silva de, Costa Junior, Carlos Tavares da, Kern, Andrea Parise, Duarte, André Augusto Azevedo Montenegro
格式: Online
语言:eng
出版: ANTAC - Associação Nacional de Tecnologia do Ambiente Construído 2019
在线阅读:https://seer.ufrgs.br/ambienteconstruido/article/view/79907
标签: 添加标签
没有标签, 成为第一个标记此记录!